Skip to content
PRECISION STAR ELECTROMECHANICAL WORKS
Section drawing of a three-storey building: ductwork, electrical cable and plumbing pipe run side by side in each ceiling void, from roof plant and a ground-floor board and pump.RF2F1FGFFIG. 01 · TYPICAL SECTION · M / E / P COORDINATIONM · DUCTE · CABLEP · PIPE

MEP contractor · Dubai, UAE

Theengineeringinside everybuilding.

Mechanical, electrical and plumbing installation for commercial and residential buildings across the UAE, for over 15 years.

  • 15+ years
  • Commercial & residential
  • UAE-wide

Licences & approvals

Client input needed · Add your licence and approval details

Trade licence no.not yet provided
Dubai Municipality classificationnot yet provided
DEWA approvalnot yet provided
Civil Defence approvalnot yet provided
Other registrationsnot yet provided

Services

Three services, installed as one coordinated system.

Air, power and water: installed by one team and coordinated so the services fit together in every ceiling void, shaft and plant room.
  • M / 01

    Mechanical

    Air conditioning and ventilation: the plant, ductwork and pipework that cool, condition and move air through a building.

    • HVAC systems
    • Ventilation and extract
    • Ductwork
    • Chilled-water and split systems
    • Fire-fighting pipingClient input needed: Confirm you install fire-fighting piping before we list it.
  • E / 02

    Electrical

    Power from the incoming supply to every board, light and socket, with the containment and earthing that keep it safe.

    • LV distribution
    • Distribution boards
    • Lighting and power
    • Cable containment and earthing
    • ELV provisions
  • P / 03

    Plumbing

    Water in and water out: supply, drainage, hot water and the pumps that move it, through to decorative water features.

    • Water supply
    • Drainage
    • Hot water systems
    • Pumps
    • Water features

Projects

How we work

A quality policy in four steps.

From the tender documents to the clearance left for maintenance, each step is there to protect system performance and running costs.
  1. 01 / 04

    Review

    Engineers check tender documents against international codes and local authority regulations, and flag any ambiguities to the client.

  2. 02 / 04

    Resolve

    Design doubts or corrections that would hurt system performance, or raise running costs after installation, are settled first.

  3. 03 / 04

    Value-engineer

    Work follows the project specification, and better options are proposed where they exist within the allocated budget.

  4. 04 / 04

    Coordinate

    All services are coordinated to avoid clashes and abortive work, with proper clearance left for maintenance.

About us

An electromechanical contractor based in Deira, Dubai.

Experience
15+years
Featured projects
6

Client input needed

Numbers: any figures you are happy to publish (projects completed, engineers on staff, emirates covered). We only show "15+ years" and "6 featured projects" until then.

Vision

Buildings across the UAE running on the latest environment-friendly MEP technology, with design value-engineered by international-level experts.

Mission

Quality, value-engineered and durable MEP installation, balancing what end users need with the latest available technology.

About us

Request a quote

Tell us about your project.

A few questions about the building and the services you need. Prefer to talk? Call or message the office directly.

What happens next

  1. 01Your answers open in WhatsApp as one message, ready to send.
  2. 02Press send. It goes straight to the Precision Star team.
  3. 03The team contacts you by your preferred method to talk through scope and next steps.

Loading the quote form. You can also call +971 4 269 2833.

Contact

Call, message or visit the office in Deira.

  • Office

    Office No. 11, Mezzanine FloorAl Fahad Building, DeiraDubai, United Arab Emirates
    P.O. Box 92551, Dubai, U.A.E.
  • Office hours

    Client input needed: Office hours: which days and times is the office open? Any Ramadan hours?

Al Fahad Building

Deira, Dubai

Schematic · not to scale

Office No. 11, Mezzanine FloorAl Fahad Building, DeiraDubai, United Arab Emirates
Open in Google Maps(opens in a new tab)
Client input needed: Confirm the exact map pin for the office (share a Google Maps link to the building entrance).